James Hardie lap siding — full re-side
Material staged on site, walls prepped from scaffolding, new Hardie plank and trim installed and painted.
Projects
Real photos from our job sites: before, during and after.
Material staged on site, walls prepped from scaffolding, new Hardie plank and trim installed and painted.
Old siding removed, new sheathing and weather barrier, then James Hardie lap siding up both floors.
Damaged cladding removed down to the framing, new James Hardie siding installed and finished.
Clean corners, window trim and flashing — the details that keep water out.
Old roof removed, deck dried in under tarp, new underlayment and architectural shingles.
Backyard cleared, footings and framing set, low-maintenance Trex composite decking installed.
A bare side yard turned into a covered Trex deck.
Freestanding pergola with a finished patio floor.
Lumber delivered, posts set in concrete, new fence line and gate.
Tile showers, tub surrounds, new vanities and fixtures.
Walls opened and rebuilt, new tub, subway tile and finished bathroom.
Tile set with a leveling system, then vanity and fixtures back in.
Large two-story home: walls, ceilings and trim prepped and repainted.
Drywall patched, rooms masked and sprayed, clean finish.
Damaged material removed, cabinet base rebuilt and refinished.
New exterior doors with security screens, trim and hardware.
Excavation, underground plumbing and forms set before the pour — Class A work.
Chain-link fence with privacy screen around a commercial yard.
Boom lift and roof work for exterior repairs on a hillside building.
Tell us about the project and send a few photos. We'll get back to you quickly.